National Guard Replacement Storage Building #1130
Louisiana Army National Guard at Camp Beauregard, Pineville, LA
Design and project management services for the design and construction administration of a 9,200 square foot metal building framed storage facility. This new facility is a replacement for the original wood framed building severely damaged by Hurricane Gustav and demolished under separate contract.
Provide a new warehouse facility for the storage of military equipment utilizing the existing stem wall foundation system employed by the demolished wood frame building.
Through BBI’s design and management, the new facility not only replaces the space lost during Hurricane Gustav but also includes amenities not offered by the previous building including: a 400 square foot, air-conditioned office; four new, large loading docks with overhead canopies for weather protection and three with individual ramps, while one dock was designed with an 8” concrete runway for large truck delivery; heating for the warehouse space; and emergency power capabilities. This scope expansion occurred without any effect on the construction budget due to the thorough and cost-conscious design and management strategies employed by BBI.




